2013 Vocational Skills Competition in Shandong Province vocational team construction equipment safety project competition rules
Time: 2017-12-29
1 2013 Shandong Province vocational skills competition in the occupation team "construction equipment installation and regulation (water supply and drainage)" project competition rules First, the name of the construction equipment installation and control (water supply and drainage) Second, the competition objective Through the competition in Shandong Province Water supply and drainage related vocational school construction, for secondary vocational schools to provide a water supply and drainage engineering technology exchange platform for each other to promote the combination of work and study personnel training mode reform and innovation, develop students' ability of sustainable development, to provide society with business needs The installation of water supply and drainage equipment, electrical technology applications and other professionals.
Third, the contest content and related requirements Competition content includes "plumbers" national occupation standard technicians and the requirements of all levels below.
(1) Contest Content The teams draw the corresponding system diagram according to the given drafting and drainage plan and the competition mission statement, according to the requirements of processing and connecting all kinds of pipe materials, installing pipe fittings and accessories, conducting pipeline pressure test and water-passing test and recording relevant Data, and then through the electrical wiring to achieve the control of the pump operation.
(2) related requirements 1, professional ethics (1) dedication, devotion to duty; (2) abide by the rules of operation, care for equipment, not fake, pay attention to quality, focus on credibility; (3) subject to the organizing committee to make the competition fair , Fair, open, obey discipline, pay attention to ethics, respect the organizing committee and staff, respect the referee.
2, related knowledge and skills (1) water supply and drainage plans and elevation plan and drawing (2) a variety of pipe processing and connection, including galvanized pipe, PP-R, stainless steel composite pipe, PVC-U pipe cutting , Sets of silk, hot melt and other connections.
(3) Connection of various pipe fittings and accessories (4) Identification and drawing of electrical schematic diagram (5) Installation and wiring of electrical control circuit 2 IV. Contest mode Contest shall adopt a team competition mode. Team, each team consists of two players, each team can be equipped with two tutors.
The competition tasks include the drawing of drainage and drainage systems, the processing and connection of various pipes, the installation of pipe fittings and accessories, pipeline pressure test and water test, electrical installation and wiring.
The contents include domestic water supply system, hot water supply system, sprinkler system, drainage system and control system.
After the competition, the drawing sheets, bill of materials, assembly test, pipeline pressure test and water quality test (see Annex 1) should be submitted.
Five, competition rules 1.
Contest in batches, the order of the participating teams, the contest station to draw lots to determine the same batch of teams using the same competition questions.
The contest is completed by two players.
During the competition, the leader and the tutor can not participate in the guidance.
2. Each contestant shall take part in the competition with the registration card issued by the organizing committee of the contest and a valid ID card. If any frauds or impostors are disqualified, the qualifications of the contestant and the team participating in the competition will be canceled.
Participants should be uniform players dress, to meet the safety requirements, should be insulated shoes, wear safety helmets.
3.
Teams enter the competition venue after 30 minutes before the start of the race to prepare for the race.
In addition to the designated drawing tools, shall not carry any information.
Teams to receive the task of the game, we must carefully check the equipment, supplies and tools are complete, normal, check and confirm the signature.
During the competition preparation division of labor can be conducted to discuss the competition program, but can not operate.
4.
Race for 4 hours, continuous, including drawing, the system connection debugging and race station cleaning time.
During the competition, food and drinking water are provided uniformly by the stadium, and players' rest, diet or toilet time are counted during the competition time.
5.
In order to protect the safety of personal and equipment, contestants must strictly abide by relevant operating rules.
Any improper operation leading to personal or equipment safety accidents, the ruling ruled that in serious cases to cancel the qualification.
6. 30 minutes before the end of the game, the referee reminds the game time.
Each team should arrange its work reasonably and ensure that the documents are kept, archived and cleared on the spot before the end of the competition. Any competition-related operations shall not be conducted until the end of the competition.
7.
After the competition, the team must submit the drawings and the quality inspection form to the station referee, confirm and sign.
8.
Contestants must take the initiative to cooperate with the referee during the competition, subject to refereeing arrangements. If there is any objection to the ruling of the Contest 3, the contestant must file a written appeal to the Arbitration Working Group through the leader.
Sixth, competition venues and facilities (A) competition venue 1.
Venue formation, bright, well-ventilated, the venue to meet the game area requirements, the site of not less than 3m net high.
2.
Each competition station AC380V AC power supply, power load of not less than 5kW, to provide independent power protection and safety protection measures.
3.
Each race area of ??not less than 15m2, to ensure smooth access to equipment and personnel.
4.
Each competition station provides a well-functioning computer and installs programming and configuration software.
(B) competition equipment THHU-PW-THPWSD-1-type water supply and drainage equipment installation and control training device for the game specified equipment 1, equipment framework No. Equipment Name Equipment Specifications or Models Quantity Unit Remarks 1 stainless steel frame 225cm
Next:   2012.6 Valves, water meters
Product Catalog
Products